Originally Posted by
Getty
No one associated with the well, or otherwise, can make a valid guess about drill results.
If we are very lucky, we could by next Monday be told that hydrocarbons have been struck, followed up by an ann that it is 75metres of nett pay gas column,
Or, anytime after that till hitting target depth and @85 days from spud, ann.s that gas shows are evident, but evaluation of water cut, porosity, flow rates etc, commercial success may not be determined until 6 weeks after drill completion.
Until then, all tickets/ shareholdings are valid, and should not be thrown away!